After working in the morning on other projects again, I started installing the cable that showed up and running other wires that go from the WX-500 in the back to the instrument panel. This took a couple hours to measure, cut, and route the wires, but when it was all done, there were a few more wires hanging around in the plane.
The routing in the back took them the same place as the antenna cable run before - up over the top of the rear avionics bay/bulkhead. This was to keep them away from the electrically noisy hydraulic motors at the bottom.
That was about all the happened on Day 7. Lots more to come as we get back to it 100%.